THE NEW MONCLER INVESTOR RELATIONS APP IS NOW AVAILABLE
LEGEND
✓ Target achieved ▸ Target on time ○ Target delayed
TARGETS | 2023 RESULTS | ||
---|---|---|---|
BLOCCO 1 | TARGETS2030
2030
2050 2023 RESULTS
▸ -36% vs 2022 absolute scope 1 and 2 emissions CO2e
▸ -8% vs 2022 absolute scope 3 CO2e emissions (-3% vs 2022 scope 3 CO2e emissions per product unit sold) | ||
BLOCCO 2 | TARGETSOngoing
2023
2024
Ongoing
2023
*Excluding shops-in-shops. 2023 RESULTS
✓ Carbon neutrality maintained in directly managed corporate sites worldwide (offices, stores, production sites and logistics hub)
✓ 100% of electricity used at directly managed corporate sites worldwide from renewable sources (~90% in 2022)
▸ Approximately 85% hybrid and electric vehicles in the Group’s corporate car fleet worldwide
✓ LEED for Building Design and Construction certification obtained for the expansion of the production site in Romania
▸ Continued the LEED certification process at the Group’s new stores worldwide
✓ Neutralised unavoidable residual emissions through two projects certified on the voluntary market and focusing respectively on circular economy and renewable energy | ||
TARGETSOngoing 2023 RESULTS
✓ Continued the energy assessment process throughout the supply chain to identify concrete actions to reduce energy consumption and related CO2 emissions and to promote the use of energy from renewable sources |