We’re working to ensure you the best user experience.

Please take a minute to fill out our survey

RESULTS AND TARGETS

Improve energy efficiency and reduce CO2 emissions

ACTIONS

2018 RESULTS

TARGETS

BLOCCO 1

ACTIONS

Environmental impact assessment of key offices and stores, and implementation of improvement and/or offsetting measures

2018 RESULTS

• ISO 14001 certification obtained for its Italian corporate offices and logistics hub in Castel San Giovanni, Piacenza

 

 

 

• New logistics hub in Castel San Giovanni, Piacenza, and the production site in Romania provided with LED lighting

TARGETS

2019 Maintenance of ISO 14001 certification at the production site in Romania, at its Italian corporate offices and logistics hub in Castel San Giovanni, Piacenza

[SDG 12]

 

 

2019 Progressive replacement of traditional lighting systems with LED lamps at the logistics hub in Castel San Giovanni, Piacenza

[SDG 12]

BLOCCO 2

ACTIONS

Purchase of electricity from renewable sources

2018 RESULTS

• 100% of electricity consumption at offices, stores, and logistics hub in Italy derived from renewable sources

TARGETS

Ongoing consumption of 100% of electricity derived from renewable sources at offices, stores, and logistics hub in Italy

[SDG 7]

BLOCCO 3

ACTIONS

Contribute to the fight against climate change

2018 RESULTS

TARGETS

2019 RReduction of CO2 emissions at the production site in Romania (base 2018)

[SDG 13]

 

 

2019 Compensation of all CO2 emissions generated by the corporate car fleet in Italy and Romania

[SDG 13]

BLOCCO 4

ACTIONS

Integration of sustainability requirements at Directly Operated Stores (DOS), such as the use of air conditioning and lighting systems with low environmental impact

2018 RESULTS

• 96% of stores worldwide* equipped with LED lighting

*Excluding the 15 shop-in-shops in which lighting is provided by the host department stores, where Moncler cannot take action.

 

 

 

 Analysis of air conditioning systems in stores in Europe, the Americas, Asia and the Rest of the World started and replacement plan prepared

TARGETS

2019 Use of LED lighting in all new stores worldwide

[SDG 7]ion.

 

 

2019 Completion of assessment of existing air-conditioning systems in stores

[SDG 13]

Reduce the environmental impact of logistics processes

Reduce the environmental impact of the shopping experience

Raise employee awareness of the environmental impact of daily activities

LEGENDA

• Achieved or in line with plan  /  Partially achieved /  Postponed

SEARCH MONCLERGROUP.COM: